Graphite Carbon New Energy

Comparison Item Traditional Manual/Mechanical Conveying Vacuum Conveyor Conveying Data Comparison
Time for conveying per ton of material About 30 minutes Within 10 minutes Efficiency increased by 66%+
Number of operators 3-5 people 1-2 people Labor cost reduced by 60%-80%
Dust concentration in the work area Up to 100mg/m³ (exceeding the standard by 12.5 times) ≤10mg/m³ (meeting national standards) Dust pollution reduced by 90%+
Material loss rate About 8% ≤3% Annual material cost saved by 62.5%+
Work environment risk High dust, prone to pneumoconiosis Low dust, meeting occupational health standards Significant reduction in occupational disease risk

Key value: Through the application of vacuum material handling equipment, Bao Carbon Mining has achieved multi-dimensional optimisation in terms of production efficiency, labour costs and environmental safety, with an annual comprehensive cost reduction of over 40%, while also meeting green mine construction standards.